Design, removal, replacement, and off-site disposal of 11 existing faux training structures within the Mobile MOUT Training area. Project includes providing new replacement “prefabricated” relocatable containerized training structures with metal floors, decks, windows, doors, roof hatches, stairs, ladders, and railings. All interior and exterior surfaces of the replacement structures to be coated with a 100% Polyurea coating before delivery, to protect against corrosion.