Quick contact info

icon_widget_image 2210 W 1st Street Sanford, FL 32771 icon_widget_image 407.323.2214 icon_widget_image info@onopa.com
s

Building 28320

Fort Gordon, GA

Building 28320

Design-Build 14,500 SF project included asbestos abatement, selective demolition, construct interior walls to provide programmed spaces, repair men and women latrines, replace all exterior doors and windows, install new doors and hardware, repair interior finishes, replace the existing HVAC system, replace the existing electrical infrastructure, lighting systems and accessories and fire detection and alarm, replace the existing interior communication system, and interface with the mass notification system (UMCS). Replace the existing roof systems EPDM and Metal roof. Provided new parking area west of building and provide new split-face brick dumpster enclosure, provided proper pavement markings, remove existing light poles, and install new fiberglass light poles.

Project Info

Category: